Our project portfolio

We have experience across a range of build categories and industries, catering to both commercial and private clients. We’ve completed projects of all shapes and sizes; from rental car hubs, cool stores and pack houses to hangars, retail showrooms and trampoline parks. We love a challenge and we love happy customers. Take a look through our case studies to get an idea of the types of structure we can construct for you, or your clients.

The Thomas Brothers Orchard in Riwaka grows and processes apples and kiwifruit for export and local markets. Growth lead to the need for construction of a large new cool store and pack house facility with

Tuatara Structures was engaged through Colliers Queenstown to develop concept plans for Plumbing World’s new Frankton retail showroom. The design had to both align with Plumbing World’s brand guidelines, but at the same time fit

As part of the next stage of building within the Remarkables Park precinct in Queenstown, Tuatara Structures was contracted to complete a multi-tenancy commercial building. Challenge Design & construct a multi-tenant commercial building. The site

Client HWR Property contracted the design and construction of a building to be leased for use as an indoor trampoline park. Tuatara Structures’ clear span structural steel design suited the height requirements of the build

OTS Global, a subsidiary of Okinawan Tourist Services (OTS) in Japan were looking for a building that would be an architectural showpiece for their NZ operations. Their flagship NZ headquarters needed to include a rental

Nick and Michelle Ward of Ohapi Fresh required the construction of a new onion processing and production facility, that incorporated a specialised drying system. Challenge The building had to be designed in consultation with the

Tuatara was contracted to construct a building shell only, for a project that already had concept plans. Although we typically complete both the design and building of a project, the team are always keen to

Advantage Plastics required a large manufacturing plant for their products – plastic goods for the agriculture, contracting, lawn, commercial, and waste industries. A separate office block was also needed for the second stage of the

Put us to the test on your project

Find out if we can build your next project faster, with lower costs and better results now.
Book a FREE project meeting today